E-Way Bill
If consigner itself in their own vehicle or hired one carries multiple consignments say 6 of 10000 each than is he liable to generate an e-way bill? If yes then under which subclause he would be covered in such situation, as in such consignment value do not exceed, and subrule which covered the loophole of generating multiple bills was sub-rule 7 which is kept in abeyance. pls, clarify.
Answer the question